Recent Work / Bathroom Remodeling
Full Bathroom Remodel — Tub, Tile & Double Vanity
Hoffman Estates, IL • Aug 13, 2025 • Bathroom Remodeling
Scope of work
- Full demolition of existing bathroom finishes
- Install new bathtub
- Install new toilet
- Replace shower/tub fixtures (valve + trim)
- Wall tile installation (tub/shower surround)
- Floor tile installation
- Tile baseboards (tile base trim around the room)
- Repaint existing double vanity cabinets (kept original cabinet boxes)
- Final caulk, grout, and finish details
Project facts
Best for
Homeowners who want a full bathroom refresh while keeping what still works — new tub/toilet and clean tile work, plus a budget-smart upgrade by repainting the existing vanity cabinets.
Photos
Tap any photo to open fullscreen. Swipe/drag to browse.
Project notes
This bathroom in Hoffman Estates started with a full demolition so we could rebuild everything clean and correctly. The goal was a fresh modern look with durable finishes and a “new bathroom” feel.
We installed a new bathtub and toilet, updated the shower/tub fixtures, and completed new tile work on both the walls and the floor. Tile baseboards were added around the room for a clean, water-resistant finish at the perimeter.
To keep the project efficient, the existing double vanity cabinet boxes were kept, but we repainted the cabinets to match the new finishes and give the vanity a refreshed, updated look.
Bathroom remodel FAQ
Quick answers to common questions about full bathroom refreshes, tile, and timelines.